December 2001

Peak District Caving > Cave News Index > December 2001

Reports:
> The Titan Surface Dig

THE TITAN SURFACE SHAFT:, December 2001:
The Titan Surface dig has now reached a depth of 31m and is well on the way to connecting with the 130m Passage in Titan's western wall.
Looking down the Titan Surface Dig.
Photo: John Cordingley 12/2001
Enlarge

all I need is 40m of Concrete Liners,
a JCB,
a dumper truck,
a generator,
a winch,
two years off work,
loads of help,
some cable
should be easy..... Dave Nixon at the small shakehole which was to dvelop into the Titan Surface Dig and the final connection between the surface, Titan and Peak Cavern.
Photo: Shaun Puckering 06/04/1999
Enlarge

<<< Previous related report - August 2001
>>> Next related report - March 2002
Email your news and info to cavenews@hitchnhike.co.uk
CLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOPCLIMB TO THE TOP